...

Basement Floor Coating in Birmingham, MI

QUESTIONS? NEED A QUOTE?

Why Birmingham Homeowners Choose MotorCity

★ 4.9 rating · 519 Google reviews

  • ✓ Lifetime warranty
  • ✓ One-day installation
  • ✓ BBB accredited (since 2020)
  • ✓ Licensed & insured

Basement Floor Coating Project in Birmingham, MI

Last updated: October 26, 2026

On this page, we document basement floor coating projects in Birmingham, MI. Our polyurea-polyaspartic coating system converts bare or cracked basement concrete into a durable, finished floor.

Berwyn Street needed tile removal and slab patching, Bradford Road needed old paint ground off, Knox Street needed a moisture barrier and crack repairs, and Polo Place needed flood-damaged tile pulled and light cracks mended — all finished in our flake coating system.

Birmingham Basement Floor Coating Case Study

These case studies document the starting condition of each basement floor. They also cover our prep steps and the finished results.

Why Basement Floors Need a Dedicated Coating

Basement concrete deals with different stress than a garage floor. Moisture vapor rising through the slab, musty odors, and failed DIY paint jobs are common problems in older basements. Bare concrete also produces dust and stains easily under regular foot traffic.

Polyurea-polyaspartic systems seal the slab against moisture and provide a durable, easy-to-clean surface. The flake broadcast hides minor surface imperfections and gives the room a finished look, whether it becomes a gym, a workshop, or a storage space.

Our Basement Floor Coating Process

Our crew starts with an inspection of the slab and a moisture test. Cracks, old adhesive, and failed coatings get ground down or patched before anything new goes on.

A moisture barrier goes down first on slabs that need one. Our crew then rolls the polyurea base coat and broadcasts color flakes by hand, finishing with a polyaspartic topcoat for traction and durability.

What Comes With Every MotorCity Basement Floor

Most basement floors finish in a single day, compared to the multi-day cure time of standard epoxy. Every installation carries a lifetime residential warranty.

Our coatings resist moisture, stains, and daily wear, so the floor holds up whether the room becomes a playroom, a home gym, or extra storage.

Tile Removal and Slab Patching Set Up Berwyn Street's Silver Creek Floor

Berwyn Street, Birmingham, MI

This Berwyn Street basement covers two rooms: a laundry room and a storage room. One room had an old tile floor; the other had rough concrete. Our crew covered 594 square feet across both rooms.

Tile Removal and Patching Prep Both Rooms

Our crew removed the old tile from one room’s floor. We patched cracks and rough spots in the other room’s slab. Both rooms were ready for a fresh coating system.

A Silver Creek Coat Finishes Both Basement Rooms

Our crew applied the base coat across both rooms. We broadcast Silver Creek flakes for a consistent look. A clear topcoat sealed the finish over two installation days.

Berwyn Street's 594-Square-Foot Basement Now Matches in Silver Creek

The tile room and the patched room now match. Our crew finished 594 square feet in Silver Creek. Our clients have one consistent floor across both rooms.

Technical Specifications

  • Location: Berwyn Street, Birmingham, MI
  • Square footage: 594 sq ft
  • Rooms: Laundry room and storage room
  • Surface prep: Tile removal in one room; crack and rough-spot patching in the other
  • Coating color: Silver Creek
  • Install date: November 12-13

Testimonials

Jay Sabaugh

This company did a great job with our floors. From the workers to management, A1 good job guys!

Morgan Strehl

The crew spent most of last week polishing and sealing the concrete floors in my loft. What started as raw, untouched concrete turned into a beautiful, shiny floor. It completely transformed the space. The guys were great to work with throughout the process.

What This Birmingham Basement Floor Actually Needed

This Berwyn Street basement spans two rooms: a laundry room and a storage room. One room had an old tile floor, and the other had cracked, uneven concrete.

Our crew removed the tile, patched the rough slab, then built up a base coat with Silver Creek flakes across both rooms.

Bradford Road's Painted Slab Becomes a Silver Creek Laundry Room

Bradford Road, Birmingham, MI

Bradford Road’s basement laundry room holds 365 square feet of open concrete. No steps or vertical walls interrupt the space. Old paint covered the slab when our crew arrived.

Grinding and a Small Patch Clear the Painted Slab

Our crew ground the old paint off the slab. A small area near the drain needed light patching. The repair stayed minor across the whole room.

An MC 4.2 Base Coat Brings In Silver Creek

Our crew spread an MC 4.2 base coat across the laundry room. We broadcast Silver Creek flakes over the wet coat. A clear topcoat sealed the finish in a single day.

365 Square Feet of Bradford Road Now Shine in Silver Creek

The old paint and small patch sit sealed beneath the new coating. Our crew finished the entire laundry room in Silver Creek. Our clients have a fresh floor to work with.

Technical Specifications

  • Location: Bradford Road, Birmingham, MI
  • Square footage: 365 sq ft
  • Room: Laundry room
  • Surface prep: Paint removal with a small patch near the floor drain
  • Base coat: MC 4.2
  • Coating color: Silver Creek
  • Install date: August 2

Testimonials

David Zimmer

Very happy with the total process and finished product. The team worked with me and was very professional and helpful. Would highly recommend Motor City Floors and Coatings to others.

Fletcher Kundtz

The crew was great to work with from start to finish. Their sales rep met me on short notice and moved up my installation date at my request. The install went exactly as promised, done in a single eight-hour day. Their products and customer service are top notch.

Knox Street's Cracked Slab Gets a Moisture Barrier and Stoney Creek Finish

Knox Street, Birmingham, MI

Knox Street’s basement spans 544 square feet. No steps and no vertical walls break up the floor plan. Old paint and a run of cracks covered the slab. Our crew had real repair work ahead before any coating could start.

Grinding Removes the Old Paint From the Slab

Our crew ground the painted surface down to bare concrete. The grinding pass also opened up the cracks for repair. The slab was rough and ready for patching next.

Mending Closes the Cracks Across the Floor

Our crew filled the cracks with a two-part mender. The repairs covered much of the slab. A moisture barrier went down once the mender cured.

An MC 4.3 Base Coat Sets the Stoney Creek Finish

Our crew spread an MC 4.3 base coat across the room. We broadcast Stoney Creek flakes with no added traction. The topcoat dried clear, sealing the finish over two days on site.

Knox Street's Basement Now Carries a Stoney Creek Floor

The cracks and moisture barrier sit sealed beneath the new coating. Our crew finished all 544 square feet in Stoney Creek. Our clients have a solid floor built to last.

Technical Specifications

  • Location: Knox Street, Birmingham, MI
  • Square footage: 544 sq ft
  • Surface prep: Paint removal and crack repairs across the slab
  • Moisture barrier: Applied before the base coat
  • Base coat: MC 4.3
  • Traction: None added
  • Coating color: Stoney Creek
  • Install date: April 11-12

Testimonials

Kevin Lynch

Overall excellent experience and service from start to finish. Had two garage floors finished which exceeded my expectations. Would highly recommend.

Rob Askew

We love our garage floor! MotorCity was recommended by a couple of my family members who used them in the past. I had several quotes and they had the best price too!

Polo Place's Flood-Damaged Tile Gives Way to a Silver Creek Basement

Polo Place, Birmingham, MI

Polo Place’s basement spans 884 square feet at the bottom of a 12-step staircase. No vertical walls break up the room. Tile covered half the floor until an earlier flood ruined it. Testing confirmed the adhesive residue held no asbestos.

Tile Removal and Light Patching Prep the Slab

Our crew pulled the remaining tile and sticky residue from half the floor. Light cracks and pits across the slab got a two-part patch. The repairs stayed minor despite the flood damage.

An MC 3.8 Base Coat Brings In Silver Creek

Our crew rolled an MC 3.8 base coat across the entire room. Silver Creek flakes went down next for color. The crew closed it out with a clear topcoat over two days of work.

884 Square Feet of Polo Place Now Finished in Silver Creek

The flood-damaged tile and old cracks sit sealed beneath the new coating. Our crew finished all 884 square feet in Silver Creek. Our clients have a fresh basement floor at the bottom of the stairs.

Technical Specifications

  • Location: Polo Place, Birmingham, MI
  • Square footage: 884 sq ft
  • Staircase: 12 wood steps lead into the basement
  • Surface prep: Tile and residue removal on half the floor; light crack and pit repairs
  • Base coat: MC 3.8
  • Traction: 16-grit
  • Coating color: Silver Creek
  • Install date: January 16-17

Testimonials

janette Vandeberghe

In the past five years I have had two garage floors done and both are wonderful experience. I would recommend Motor City Floors and Coatings to anyone.

Mark Perkins

Can’t stop looking at my garage. Utterly perfect. Great job and super professional.

Serving Birmingham in Oakland County

We install polyurea-polyaspartic basement floor coatings across Birmingham. Our service area includes Oakland County, plus nearby Bloomfield Hills, Bloomfield Township, and Troy. No matter where your basement sits, you get the same durable dual-coat system, one-day installation, and lifetime warranty.

MotorCity Floors and Coatings also serves residents and businesses across Metro Detroit, including Bloomfield Hills, Bloomfield Township, Troy, Detroit, Novi, Ypsilanti, and Ann Arbor.

FAQ

Find answers to your technical questions about polyurea-polyaspartic basement floor coatings.

How big do basement floor coating jobs in Birmingham run?

Birmingham basement jobs have ranged from 365 to 884 square feet so far. Our crew scopes each project to the specific rooms our clients want coated.

Why does one basement coat two separate rooms and another coats just one?

Berwyn Street’s job covered both a laundry room and a storage room. Bradford Road’s job covered only its laundry room. Our crew coats whatever rooms our clients choose.

Why does only one basement include a staircase in its scope?

Polo Place has 12 wood steps leading into the basement. Our crew coats steps only when a particular basement calls for it.

Why does one basement get a moisture barrier and another doesn't?

Knox Street’s slab needed a moisture barrier before the base coat. Our crew checks moisture on every job. A barrier goes down only when the reading calls for it.

The MotorCity Advantage

MotorCity Floors and Coatings installs polyurea-polyaspartic coating systems on basements, pool decks, walkways, and porches throughout Southeast Michigan. These dual-coating systems resist moisture and chemicals, cure faster than epoxy, and hold their color for years. We back every installation with a warranty.

Each project includes diamond grinding preparation and crack or stain repair where the concrete needs it, so the coating bonds correctly across the full surface. Our crew removed tile and patched cracks across two basement rooms on Berwyn Street in Birmingham before any coating went down. Every repair is addressed at the source, not just covered over.

Scroll to Top