...

Basement Floor Coating in Detroit, MI

QUESTIONS? NEED A QUOTE?

Why Detroit Homeowners Choose MotorCity

★ 4.9 rating · 519 Google reviews

  • ✓ Lifetime warranty
  • ✓ One-day installation
  • ✓ BBB accredited (since 2020)
  • ✓ Licensed & insured

Basement Floor Coating Project in Detroit, MI

Last updated: October 29, 2026

On this page, we document basement floor coating projects in Detroit, MI. Our polyurea-polyaspartic coating system converts bare or cracked basement concrete into a durable, finished floor.

Lothrop needed crack repair, concrete grinding, and old paint removal before a Pebble Beach finish, Lichfield Road needed crack and pitting repair plus non-asbestos mastic removal before a Mediterranean finish, South Eastlawn Court needed carpet removal and slab repair before an Aztec Beige finish, and Lincolnshire Drive needed pit repair before a Graphite finish — all done in our flake coating system.

Detroit Basement Floor Coating Case Studies

These case studies document the starting condition of each basement floor. They also cover our prep steps and the finished results.

Why Basement Floors Need a Dedicated Coating

Basement concrete deals with different stress than a garage floor. Moisture vapor rising through the slab, musty odors, and failed DIY paint jobs are common problems in older basements. Bare concrete also produces dust and stains easily under regular foot traffic.

Polyurea-polyaspartic systems seal the slab against moisture and provide a durable, easy-to-clean surface. The flake broadcast hides minor surface imperfections and gives the room a finished look, whether it becomes a gym, a workshop, or a storage space.

Our Basement Floor Coating Process

Our crew starts with an inspection of the slab and a moisture test. Cracks, old adhesive, and failed coatings get ground down or patched before anything new goes on.

A moisture barrier goes down first on slabs that need one. Our crew then rolls the polyurea base coat and broadcasts color flakes by hand, finishing with a polyaspartic topcoat for traction and durability.

What Comes With Every MotorCity Basement Floor

Most basement floors finish in a single day, compared to the multi-day cure time of standard epoxy. Every installation carries a lifetime residential warranty.

Our coatings resist moisture, stains, and daily wear, so the floor holds up whether the room becomes a playroom, a home gym, or extra storage.

Old Concrete and Two Visits Become One Pebble Beach Floor on Lothrop

Lothrop, Detroit, MI

This basement in Detroit held 1,050 square feet of original concrete. The slab came from an older build, cracked and uneven throughout.

Our crew worked the job over two visits. We finished it in Pebble Beach with 16-grit traction.

Grinding Through Cracks and Uneven Spots

Cracks across the slab. Uneven sections throughout the floor. An older basement with original concrete that needed real repair work.

Our crew ground down the rough spots first. We patched the larger cracks by hand.

Stripping Old Paint Before the New Floor

Paint covered sections of the original floor. Some of it had already started to flake.

Our crew stripped the old paint from the concrete. We ground these areas to match the rest of the slab.

A Pebble Beach Finish for an Older Basement

Our crew applied the polyurea base coat across the repaired slab. We broadcast Pebble Beach flakes by hand. Our crew finished the floor with a polyaspartic topcoat for 16-grit traction.

A Floor That Matches the Rest of the House

This older home in Detroit now has a basement floor in Pebble Beach. Our clients get one consistent surface instead of patched, uneven concrete.

Technical Specifications

  • Location: Lothrop, Detroit, MI
  • Square footage: 1,050 sq ft (basement)
  • Surface prep: Crack and uneven-concrete repair; old paint removal
  • Basement access: Four steps down from the main level
  • Coating color: Pebble Beach
  • Traction: 16-grit
  • Install dates: April 26 and May 16, 2025

Testimonials

Rose Johnston

Motor City Flooring epoxied our basement 5 yrs ago. Since then we reconfigured cabinets etc and the floor needed touch ups where the concrete was bare. They were awesome then and were awesome now. Highly recommend.

J S

A family member recommended this company to me to do my basement floors and I’m so glad they did. It completely transformed my basement into a new, clean, livable space. The entire process from start to finish was easy, the staff are great to work with, and I really feel like this is something you can do to your home that is worth every penny.

What This Lothrop Basement Floor Actually Needed

This Lothrop basement in Detroit covered 1,050 square feet of original concrete. Our crew ground down cracks and uneven sections throughout the slab.

Some areas also had old paint that needed stripping first. Our crew finished the floor in Pebble Beach with 16-grit traction.

A New Home's Old Tile Makes Way for Mediterranean Flakes on Lichfield

Lichfield Road, Detroit, MI

Our clients were new to this home when they called MotorCity. The basement covered 541 square feet, no steps, no vertical surfaces.

Old tile had already come out before our crew arrived, tested positive for asbestos. Mastic, cracks, and pitting remained across the slab.

Patching the Pitted, Cracked Slab

Our crew found pitting and cracks scattered across the slab. These needed repair first.

Our crew patched each spot individually. This basement had no vertical surfaces, so the repair work stayed on the floor.

Clearing Out the Old Mastic

The old tile was already gone when our crew arrived. It had tested positive for asbestos and someone else handled its removal. What remained was mastic, confirmed free of asbestos.

Our crew ground that mastic off the slab.

Mediterranean Flakes Complete a Smooth Finish

Our crew rolled out the Mc3.9 base coat, covering the repaired slab. We hand-broadcast the Mediterranean flakes next. Our crew finished with a clear polyaspartic topcoat, skipping the traction additive.

A Fresh Start in a New Home

Our clients moved into a new home with a basement full of old history. Now they have one finished room, from the slab up.

Technical Specifications

  • Location: Lichfield Road, Detroit, MI
  • Square footage: 541 sq ft (basement)
  • Surface prep: Crack and pitting repair; mastic removal (confirmed non-asbestos; old asbestos tile removed separately before our crew arrived)
  • Vertical surfaces: None
  • Steps: None
  • Coating system: Mc3.9 polyurea base coat, clear polyaspartic topcoat
  • Coating color: Mediterranean
  • Traction additive: None
  • Install date: November 27

Testimonials

Jeremy Miller

MotorCity has completed 4 projects for us. Workmanship is top notch. Floors look gorgeous and take a beating. The whole process is seamless. Great communication Great product. I highly recommend Update: Motorcity has completed another project for me. Redid basement floors at our cottage up north. Couldn’t be happier with the results. Crews were on time and professional and above all floors look great!

DCD Labs

Our basement floor looks incredible! These guys did a great job. No mess, it’s like they weren’t even there. 100% recommend.

From Carpet and Cracks to a Sealed Floor on South Eastlawn

South Eastlawn Court, Detroit, MI

Carpet covered this basement floor for years before our clients pulled it up. Underneath, the slab held up well, with a few scattered cracks here and there.

At 790 square feet, this basement needed no vertical coating and no steps. A back storage area stayed out of scope, so our crew masked its doorway first.

Grinding Through Old Carpet Adhesive

Our crew ground the bare concrete to open up the surface. Old carpet adhesive had left patches that needed extra passes. Dust collection kept the work area clean throughout.

Patching Cracks and Pitting in the Slab

A few cracks ran through sections of the slab. Shallow pitting sat near one of the floor drains.

Our crew mixed and troweled repair mortar into each spot. Once cured, every patch sat flush with the surrounding concrete.

An Aztec Beige Polyaspartic Finish

Our crew rolled the M-3 polyaspartic coating across the finished slab. Aztec Beige flakes went down next, broadcast to full coverage. A clear topcoat sealed everything in with 16-grit traction.

One Sealed Floor, One Storage Area Still Closed Off

This South Eastlawn Court basement went from carpet and cracks to one sealed floor. Our clients get a storage area closed off, and one floor ready for the rest.

Technical Specifications

  • Location: South Eastlawn Court, Detroit, MI
  • Square footage: 790 sq ft (basement)
  • Surface prep: Carpet and adhesive removal; crack and pitting repair
  • Vertical surfaces: None
  • Steps: None
  • Coating system: M-3 polyaspartic coating
  • Coating color: Aztec Beige
  • Traction additive: 16-grit
  • Install date: November 16

Testimonials

Mark Sulik

Had the garage floor and basement floors done. Both jobs look great. Would recommend MotorCity Floors to everyone.

Lee Victorian

I first thought about having an epoxy floor application 20 years ago. Well, I’m glad I waited and discovered Motor City Floors and Coating. Not only was it worth the wait, but it was educational for me as well in learning their process and materials they use. Their unique superior product (Polyurea and poly aspartic) and process, separates them from other competitors. We couldn’t have been more pleased with the results of our new garage floor. Ecstatically speaking, it was the perfect facelift, giving the garage a new look. The crew worked efficiently and reasonably fast, completing the job within the time frame I was initially given. This is the only company I would recommend to family and friends.

Patching a Few Pits Before a Graphite Finish on Lincolnshire

Lincolnshire Drive, Detroit, MI

This basement job covered one back area, 267 square feet total. Our clients wanted the main room finished, plus the closet nearest the door.

The other closets in this basement stayed untouched, outside the scope of this job. The old concrete showed a few scattered pits, nothing major.

Patching a Few Pits in the Slab

Our crew found a handful of pits across the slab. None ran deep, but each one needed filling before coating.

Our crew mixed patch material and worked it into every spot. Once cured, the patches blended into the rest of the floor.

A Graphite Finish in Single Broadcast

The M-3 base coat went down next, covering room and closet alike. The coating carried straight from the main room into the closet. Graphite flakes went down in a single broadcast pass. Two coats of clear topcoat sealed in 16-grit traction.

One Room, One Closet, Done

This back area now reads as one continuous Graphite floor. Our clients kept the rest of the basement for another day.

Technical Specifications

  • Location: Lincolnshire Drive, Detroit, MI
  • Square footage: 267 sq ft (basement, back area)
  • Surface prep: Pit and minor crack repair
  • Scope: Main room and the closet nearest the entry door
  • Coating system: M-3 base coat, single broadcast, double topcoat
  • Coating color: Graphite
  • Traction additive: 16-grit
  • Install date: September 29

Testimonials

Scott Elliott

Our garage floor, work done by Motor City Coatings, looks great and has given the house a new look!

Lori Wright

The did a great job on our garage floor.

Serving Detroit in Wayne County

We install polyurea-polyaspartic basement floor coatings across Detroit. Our service area includes Wayne County, plus nearby Hamtramck, Highland Park, and Harper Woods. No matter where your basement sits, you get the same durable dual-coat system, one-day installation, and lifetime warranty.

MotorCity Floors and Coatings also serves residents and businesses across Metro Detroit, including Hamtramck, Highland Park, Harper Woods, Novi, Ypsilanti, and Ann Arbor.

FAQ

Find answers to your technical questions about polyurea-polyaspartic basement floor coatings.

How big do basement floor coating jobs in Detroit run?

Detroit basement jobs have ranged from 267 to 1,050 square feet so far. Our crew scopes each project to the specific area our clients want coated.

Why does only one basement include steps in its scope?

Lothrop’s basement sits four steps down from the main level. Lichfield Road, South Eastlawn Court, and Lincolnshire Drive all have no steps at all.

Does old flooring material ever test positive for asbestos in these basements?

A different crew removed the old asbestos tile at Lichfield Road before our crew arrived. Our crew then confirmed the leftover mastic there was non-asbestos. Our crew does not perform asbestos abatement on any job.

Why does one basement coating job need two separate install visits?

Lothrop’s basement finished across two visits, April 26 and May 16, 2025. Our crew splits bigger or more complex basement jobs across multiple visits when needed.

The MotorCity Advantage

MotorCity Floors and Coatings installs polyurea-polyaspartic coating systems on basements, pool decks, walkways, and porches throughout Southeast Michigan. These dual-coating systems resist moisture and chemicals, cure faster than epoxy, and hold their color for years. We back every installation with a warranty.

Each project includes diamond grinding preparation and crack or stain repair where the concrete needs it, so the coating bonds correctly across the full surface. Our crew ground down cracks and uneven spots on Lothrop in Detroit. We also stripped old paint from parts of the floor. Every repair is addressed at the source, not just covered over.

Scroll to Top