Basement Floor Coating Project in Livonia, MI

Last updated: October 13, 2026

On this page, we document basement floor coating projects in Livonia, MI. Our polyurea-polyaspartic coating system converts bare or cracked basement concrete into a durable, finished floor.

Every basement starts in its own condition. The Bretton Drive basement had hairline cracks across an otherwise solid slab. The Richland basement had scattered pits, small cracks, and a section of old stick-on tile. The Hammer Lane basement had old carpet, tile, and adhesive to remove. The Houghton Street basement needed only minor crack repair after asbestos abatement.

Livonia Basement Floor Coating Case Study

These case studies document the starting condition of each basement floor. They also cover our prep steps and the finished result.

Why Basement Floors Need a Dedicated Coating

Basement concrete deals with different stress than a garage floor. Moisture vapor rising through the slab, musty odors, and failed DIY paint jobs are common problems in older basements. Bare concrete also produces dust and stains easily under regular foot traffic.

Polyurea-polyaspartic systems seal the slab against moisture and provide a durable, easy-to-clean surface. The flake broadcast hides minor surface imperfections and gives the room a finished look, whether it becomes a gym, a workshop, or a storage space.

Our Basement Floor Coating Process

Our crew starts with an inspection of the slab and a moisture test. Cracks, old adhesive, and failed coatings get ground down or patched before anything new goes on.

A moisture barrier goes down first on slabs that need one. Our crew then rolls the polyurea base coat and broadcasts color flakes by hand, finishing with a polyaspartic topcoat for traction and durability.

What Comes With Every MotorCity Basement Floor

Most basement floors finish in a single day, compared to the multi-day cure time of standard epoxy. Every installation carries a lifetime residential warranty.

Our coatings resist moisture, stains, and daily wear, so the floor holds up whether the room becomes a playroom, a home gym, or extra storage.

Bretton Drive: Two Visits,
One Chestnut Basement Floor

Bretton Drive, Livonia, MI

Our crew split this 915 sq ft basement into two visits, one week apart. The family wanted a finished floor before their holiday guests arrived, not during it.

The existing slab had hairline cracks across a few sections. The concrete was in good shape overall, and the room was never a walkout.

Closing the Hairline Cracks

We filled each hairline crack with a flexible polyurea filler. Our crew troweled the filler flush against the surrounding concrete. The repair cured overnight before work continued on the second visit.

Chestnut Polyaspartic, Installed Over Two Days

Our crew coated the floor in chestnut polyaspartic with a light traction additive. We split the application across two days, December 22 and December 29.

A Basement Ready for the Holidays

Our clients had a finished basement days before their holiday guests arrived. The chestnut floor resists stains, and the light traction keeps it safe underfoot.

Technical Specifications

  • Square footage: 915 sq ft
  • Starting condition: Hairline cracks, good shape, not a walkout
  • Coating color: Chestnut
  • Traction level: Light
  • Install dates: December 22 and December 29

Testimonials

Mike Richardson

These are the best! Professional, incredible crew that are more than friendly and pay attention to all the details. Highly recommend! I have had MC finish both my restaurant commercial floors and residential garage.

Steve Ray

Motor city came out today and as promised did a beautiful job, finished it in less than one day. The workers were professional and friendly and certainly knew what they were doing.

What This Livonia Basement Slab Actually Needed

Hairline cracks across an otherwise sound slab are common in older Michigan basements. The Bretton Drive project needed crack repair before any coating could go down.

Our crew filled every hairline crack with a flexible polyurea filler, then split the full installation across two visits. Every basement we coat gets the same standard: the slab is fully assessed and prepared before the coating system goes down.

Tile Out, Cracks Filled — A Safari Floor for Richland

Richland, Livonia, MI

671 square feet of basement concrete. A few pits scattered across the slab. Small cracks in isolated spots, nothing structural.

One corner had a different problem. About 30 square feet of stick-on tile stayed stuck to the concrete below. Our clients wanted one floor, not two different surfaces.

Tile Removal and Crack Repair

Our crew started on the tile section first. We stripped the stick-on tile off the slab. Then our crew cleared the old adhesive underneath.

Next, our crew moved to the pits and cracks. We ground each pit back to solid concrete. We filled every crack with patching compound.

Safari Base Coat and 16-Grit Traction

Our crew applied the MC4.2 polyurea base coat across the full basement. We broadcast the Safari flake blend by hand over the wet base.

Our team topped the floor with a clear polyaspartic topcoat. We added 16-grit traction for a non-slip surface. Our crew turned two different surfaces into one continuous floor.

One Basement, No Seams

The tile section and the rest of the slab now match. Same Safari color, same sheen, same traction throughout. Our clients get one basement floor, not two.

Technical Specifications

  • Square footage: 671 sq ft
  • Starting condition: Scattered pits and small cracks; approx. 30 sq ft of stick-on tile removed
  • Coating color: Safari
  • Traction level: 16-grit
  • Install date: February 25, 2025

Testimonials

Kevin Brown

We just had our second garage floor completed by MotorCity Floors and Coatings, and once again the entire team absolutely knocked it out of the park.

Mark Lewandowski

Excellent experience. Had them do the garage floor in our current home a few years ago after doing a lot of legwork into who I thought might be the best to do the job. We weren’t disappointed.

Hammer Lane's Basement Trades Carpet and Tile for Silvercreek

Hammer Lane, Livonia, MI

This Hammer Lane basement held 520 square feet of carpet and tile. Carpet adhesive and old tack strips covered both floor sections. Our clients wanted every trace of both floors gone.

The scope had firm boundaries. Our crew skipped the water closet entirely. Work stopped where the stairs come down on one side. Carpet came out right up to that line.

Removing Two Old Floor Coverings

Our crew pulled up the old carpet first. Tack strips lined the edge where carpet met the wall.

We pried out every strip and patched each hole. Then our crew stripped the tile and scraped off the adhesive.

Silvercreek Coating and a Moisture Check

Our crew tested the slab for moisture before coating anything. The reading came back low, just 3 percent. That number meant our crew skipped the extra vapor barrier.

Our crew applied the Silvercreek base coat across the full basement. We broadcast Silvercreek flakes by hand over the wet coat. Our team sealed everything with a polyaspartic topcoat for added protection.

A Clean Line at the Stairs

The basement now has one continuous Silvercreek floor. The boundary line at the stairs stays crisp and level. Our clients kept their water closet and stair carpet exactly as planned.

Technical Specifications

  • Square footage: 520 sq ft
  • Starting condition: Carpet and tile removed, with adhesive and tack strips cleared from the slab
  • Area excluded: Water closet and stair-side carpet
  • Coating color: Silvercreek
  • Moisture reading: 3 percent
  • Install date: February 26, 2025

Testimonials

Julius Buzzard

We had a fantastic experience with Motor City Floors & Coatings. Their team resurfaced and refinished the flooring at the Ypsilanti Farmers MarketPlace downtown location, and the results completely transformed the space.

Elisa Pesta

Our new garage floor was done in one day. It looks beautiful and is much more resilient and cleanable than it was before. Everyone at Motor City, from customer service, to sales, to installation, was very professional and courteous.

After Abatement, a Stoney Creek Floor for Houghton Street

Houghton Street, Livonia, MI

This Houghton Street basement spans 760 square feet, floor only. Our crew left the walls untouched. No stairs fell inside the scope.

The basement’s old tile needed asbestos abatement first. That removal happened before our crew arrived. Our crew started on an already-cleared slab. Only minor cracking showed once the tile was gone.

Minor Cracks, Minor Work

Our crew found only a few small cracks in the slab. We patched each one with mender compound. The repair work finished fast, with nothing more to touch.

MC3.8 Base Coat and Stoney Creek Flake

Our crew coated the slab with MC3.8 polyurea first. Stoney Creek flakes went down next, scattered across the wet surface by hand. Our team closed it out with standard traction for grip.

One Smooth Floor, No Walls Touched

The basement floor is now one smooth Stoney Creek surface. Our crew never touched the walls, exactly as planned. Our clients kept their minor-cracking worries behind them.

Technical Specifications

  • Square footage: 760 sq ft
  • Starting condition: Minor cracking found after asbestos abatement; no additional removal needed
  • Scope: Floor only, no vertical coating, no stairs
  • Base coat: MC3.8 polyurea
  • Coating color: Stoney Creek
  • Traction level: Standard
  • Install date: May 23, 2025

Testimonials

Greg Miron

Absolutely satisfied with the service provided and the end result, my garage looks new again. I held off 5 years ago cause didn’t want to spend the money, after my concrete really started to deteriorate I pulled the trigger.

Raquel Orduna-Rios

I want to thank Motor City Floors for transforming my porch and garage. The crew was fantastic! They worked hard, kept everything clean, and were respectful throughout the process.

Serving Livonia & Wayne County

We install polyurea-polyaspartic basement floor coatings across Livonia and throughout Wayne County, including nearby Westland, Plymouth, and Farmington Hills. No matter where your basement sits, you get the same durable dual-coat system, one-day installation, and lifetime warranty.

MotorCity Floors and Coatings also serves residents and businesses across Metro Detroit, including Westland, Plymouth, Farmington Hills, Detroit, Novi, Ypsilanti, and Ann Arbor.

FAQ

Find answers to your technical questions about polyurea-polyaspartic basement floor coatings.

How big do basement floor coating jobs in Livonia run?

Livonia basement jobs have ranged from 520 to 915 square feet so far. Our crew scopes each project to the specific area our clients want coated.

Why did one basement installation take two separate days?

Bretton Drive’s basement spanned two install days, December 22 and December 29. Our crew splits larger jobs across multiple days when the schedule calls for it.

Why does traction level differ from basement to basement?

Our clients pick the traction level for their own basement. Bretton Drive got light traction, Richland got 16-grit, and Houghton Street got the standard level.

Why does surface prep differ from one Livonia basement to the next?

Richland needed about 30 square feet of old stick-on tile removed. Hammer Lane needed carpet, tile, adhesive, and tack strips cleared first. Houghton Street needed only minor crack repair after an earlier asbestos abatement.

The MotorCity Advantage

MotorCity Floors and Coatings installs polyurea-polyaspartic coating systems on basements, pool decks, walkways, and porches throughout Southeast Michigan. These dual-coating systems resist moisture and chemicals, cure faster than epoxy, and hold their color for years. We back every installation with a warranty.

Each project includes diamond grinding preparation and crack or stain repair where the concrete needs it, so the coating bonds correctly across the full surface. When hairline cracks run across a slab — as our crew found at the Bretton Drive property in Livonia — we fill them with a flexible polyurea filler before any coating goes down. Every repair is addressed at the source, not just covered over.